1 00:00:00,000 --> 00:00:00,500 [Music] 2 00:00:00,520 --> 00:00:01,780 Hi I'm Amy Buck. 3 00:00:01,780 --> 00:00:02,920 I'm the lead engineer 4 00:00:02,920 --> 00:00:04,280 for the thermal protection system 5 00:00:04,420 --> 00:00:06,060 on the Launch Vehicle Stage Adapter 6 00:00:06,340 --> 00:00:08,320 and this is SLS in Sixty Seconds. 7 00:00:11,660 --> 00:00:12,660 The thermal protection system 8 00:00:12,660 --> 00:00:14,280 protects the rocket from the 9 00:00:14,280 --> 00:00:15,700 heat of launch as well as keeps 10 00:00:15,760 --> 00:00:17,660 the fuel in the fuel tanks cold. 11 00:00:20,320 --> 00:00:21,340 When we apply the foam 12 00:00:21,540 --> 00:00:22,900 it looks like this, 13 00:00:22,900 --> 00:00:24,840 but when it sits out in the sun it turns 14 00:00:24,880 --> 00:00:26,160 orange it gets a tan, kinda like we do. 15 00:00:30,020 --> 00:00:31,060 We're applying the 16 00:00:31,080 --> 00:00:32,320 thermal protection to the 17 00:00:32,340 --> 00:00:33,620 Launch Vehicle Stage Adapter 18 00:00:33,620 --> 00:00:35,340 Seen behind me. This is the 19 00:00:35,420 --> 00:00:37,080 largest piece of SLS being 20 00:00:37,280 --> 00:00:41,000 built here at Marshall. 21 00:00:41,000 --> 00:00:42,520 The Launch Vehicle Stage Adapter 22 00:00:42,520 --> 00:00:43,480 connects the core stage, 23 00:00:43,680 --> 00:00:44,400 which holds the fuel tanks 24 00:00:44,460 --> 00:00:45,800 to the upper part of the rocket. 25 00:00:49,200 --> 00:00:49,720 We'll check the thickness 26 00:00:49,760 --> 00:00:51,100 and then we'll test 27 00:00:51,305 --> 00:00:52,338 for adhesion to make sure 28 00:00:52,540 --> 00:00:53,420 it's stuck on. 29 00:00:53,420 --> 00:00:54,540 This will ensure that the 30 00:00:54,580 --> 00:00:55,560 thermal protection system 31 00:00:55,580 --> 00:00:57,040 is ready for launch